Value engineering
41 U.S.C. § 1711
in effectEach executive agency shall establish and maintain cost-effective procedures and processes for analyzing the functions of a program, project, system, product, item of equipment, building, facility, service, or supply of the agency. The analysis shall be—
(1) performed by qualified agency or contractor personnel; and
(2) directed at improving performance, reliability, quality, safety, and life cycle costs.
Source: OLRC USLMURL: https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc41@119-95.zipFetched: 6/5/2026
