TIME FOR NOTICE.
Tex. PROP Code § 53.234.
in effectThe lien claimant must give notice not later than the 15th day of the second month following the month in which the labor was performed or the material furnished.
Acts 2009, 81st Leg., R.S., Ch. 1304 (H.B. 2515 ), Sec. 3, eff. September 1, 2009.
