New construction building permits — Appraisal of building.
RCW 36.21.070
in effectUpon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.
Upon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=36.21&full=trueFetched: 6/29/2026
