Section 13888.
Cal. Water Code - WAT § 13888.
in effectPreliminary design work, including a cost estimate for the project, shall be completed before the grant is awarded. Operation and maintenance costs shall be the responsibility of the public agency and may not be considered as part of the project cost.
Source: CA Legislative Counsel Bulk DataURL: https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zipFetched: 6/27/2026
