Order of tests.
29 C.F.R. § 1919.35
in effectEffective: 2024-07-01When both unit and loose gear proof load tests are required, the loose gear test may be carried out after completion of the unit test.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-29.xmlFetched: 7/26/2026
