What are the design requirements for the production and process control system?
21 C.F.R. § 111.60
in effectEffective: 2024-07-01(a) Your production and in-process control system must be designed to ensure that the dietary supplement is manufactured, packaged, labeled, and held in a manner that will ensure the quality of the dietary supplement and that the dietary supplement is packaged and labeled as specified in the master manufacturing record; and
(b) The production and in-process control system must include all requirements of subparts E through L of this part and must be reviewed and approved by quality control personnel.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-21.xmlFetched: 7/26/2026
