Ferries — Fourteen year long range improvement plan — Contents.
RCW 36.54.015
in effectThe legislative authority of every county operating ferries shall prepare, with the advice and assistance of the county engineer, a fourteen year long range capital improvement plan embracing all major elements of the ferry system. Such plan shall include a listing of each major element of the system showing its estimated current value, its estimated replacement cost, and its amortization period.
The legislative authority of every county operating ferries shall prepare, with the advice and assistance of the county engineer, a fourteen year long range capital improvement plan embracing all major elements of the ferry system. Such plan shall include a listing of each major element of the system showing its estimated current value, its estimated replacement cost, and its amortization period.
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=36.54&full=trueFetched: 6/29/2026
