Permit issued to a marina or marine terminal for regular maintenance activities.
RCW 77.55.151
in effect(1) Upon application under RCW 77.55.021 , the department shall issue a renewable, five-year permit to a marina or marine terminal for its regular maintenance activities identified in the application. (2) For the purposes of this section, regular maintenance activities may include, but are not limited to: (a) Maintenance or repair of a boat ramp, launch, or float within the existing footprint; (b) Maintenance or repair of an existing overwater structure within the existing footprint; (c) Maintenance or repair of boat lifts or railway launches; (d) Maintenance or repair of pilings, including the replacement of bumper pilings; (e) Dredging of less than fifty cubic yards; (f) Maintenance or repair of shoreline armoring or bank protection; (g) Maintenance or repair of wetland, riparian, or estuarine habitat; and (h) Maintenance or repair of an existing outfall. (3) The five-year permit must include a requirement that a fourteen-day notice be given to the department before regular maintenance activities begin. (4) A permit under this section is subject to the application fee provided in *RCW 77.55.321 .
(1) Upon application under RCW 77.55.021 , the department shall issue a renewable, five-year permit to a marina or marine terminal for its regular maintenance activities identified in the application.
(2) For the purposes of this section, regular maintenance activities may include, but are not limited to:
(a) Maintenance or repair of a boat ramp, launch, or float within the existing footprint;
(b) Maintenance or repair of an existing overwater structure within the existing footprint;
(c) Maintenance or repair of boat lifts or railway launches;
(d) Maintenance or repair of pilings, including the replacement of bumper pilings;
(e) Dredging of less than fifty cubic yards;
(f) Maintenance or repair of shoreline armoring or bank protection;
(g) Maintenance or repair of wetland, riparian, or estuarine habitat; and
(h) Maintenance or repair of an existing outfall.
(3) The five-year permit must include a requirement that a fourteen-day notice be given to the department before regular maintenance activities begin.
(4) A permit under this section is subject to the application fee provided in *RCW 77.55.321 .
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=77.55&full=trueFetched: 6/29/2026
