220 ILCS 5/9-217
220 ILCS 5/9-217
in effect(220 ILCS 5/9-217) (from Ch. 111 2/3, par. 9-217) Sec. 9-217. In each case or proceeding to determine the reasonableness of rates for any electric utility which involves the proposed inclusion of a significant new generation or production facility in rate base, the Commission may consider the adoption of a rate moderation plan which is designed to diminish the immediate rate impact of such proposed inclusion. (Source: P.A. 84-617.)
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.ilga.gov/legislation/ilcs/ilcs.aspFetched: 10/17/2026
