Filing of cost estimate by county engineer; limitation on entry into contract
Ind. Code § 36-9-40-8
in effectSec. 8. (a) At least ten (10) days before the date fixed for a hearing under section 7 of this chapter, the engineer of the county shall file with the works board an estimate of the maximum cost of construction of the system proposed by the works board.
(b) A county may not enter into a contract under the preliminary resolution if the contract exceeds the engineer's estimate filed under subsection (a).
As added by P.L.7-2002, SEC.1.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://iga.in.gov/laws/2026/ic/titles/36Fetched: 10/17/2026
