PROCEDURES FOR IMPLEMENTING NEPA
33 C.F.R. Part 230
in effectEffective: 2024-07-01Contents
appendixAppendix A to Part 230. Appendix A to Part 230—Processing Corps NEPA DocumentsappendixAppendix B to Part 230. Appendix B to Part 230 [Reserved]appendixAppendix C to Part 230. Appendix C to Part 230—Notice of Intent To Prepare a Draft EISsection230.1. Purpose.section230.2. Applicability.section230.3. References.section230.4. Definitions.section230.5. Responsible officials.section230.6. Actions normally requiring an EIS.section230.7. Actions normally requiring an Environmental Assessment (EA) but not necessarily an EIS.section230.8. Emergency actions.section230.9. Categorical exclusions.section230.10. Environmental Assessments (EA).section230.11. Finding of No Significant Impact (FONSI).section230.12. Notice of intent and scoping.section230.13. Environmental Impact Statement (EIS).section230.14. Record of decision and implementation.section230.15. Mitigation and monitoring.section230.16. Lead and cooperating agencies.section230.17. Filing requirements.section230.18. Availability.section230.19. Comments.section230.20. Integration with State and local procedures.section230.21. Adoption.section230.22. Limitations on actions during the NEPA process.section230.23. Predecision referrals.section230.24. Agency decision points.section230.25. Environmental review and consultation requirements.section230.26. General considerations in preparing Corps EISs.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
