Toll bridges — Construction directed — Costs.
RCW 47.56.120
in effectIn the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.
In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=47.56&full=trueFetched: 6/29/2026
