Capital plan.
RCW 47.60.375
in effect(1) The capital plan must adhere to the following: (a) A current ridership demand forecast; (b) Vehicle level of service standards as described in RCW 47.06.140 ; (c) Operational strategies as described in RCW 47.60.327 ; and (d) Terminal and vessel design standards as described in RCW 47.60.365 . (2) The capital plan must include the following: (a) A current vessel preservation plan; (b) A current systemwide vessel rebuild and replacement plan as described in RCW 47.60.377 ; (c) A current vessel deployment plan; and (d) A current terminal preservation plan that adheres to the life-cycle cost model on capital assets as described in RCW 47.60.345 .
(1) The capital plan must adhere to the following:
(a) A current ridership demand forecast;
(b) Vehicle level of service standards as described in RCW 47.06.140 ;
(c) Operational strategies as described in RCW 47.60.327 ; and
(d) Terminal and vessel design standards as described in RCW 47.60.365 .
(2) The capital plan must include the following:
(a) A current vessel preservation plan;
(b) A current systemwide vessel rebuild and replacement plan as described in RCW 47.60.377 ;
(c) A current vessel deployment plan; and
(d) A current terminal preservation plan that adheres to the life-cycle cost model on capital assets as described in RCW 47.60.345 .
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=47.60&full=trueFetched: 6/29/2026
