Notice and failure to make required connection.
8 Pa.C.S. § 2462
in effectAn owner shall be given at least 45 days' notice of any ordinance requiring a water connection, and, upon failure of the owner to make the required connection, the borough may make the connection and collect the cost from the owner by a municipal claim or in an action of assumpsit. All connections required shall be uniform.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.palegis.us/statutes/consolidated/view-statute?txtType=HTM&ttl=08Fetched: 10/16/2026
