Charge for capacity and firm energy.
10 C.F.R. § 904.6
in effectEffective: 2024-07-01The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-10.xmlFetched: 7/26/2026
