Guarantee fee.
24 C.F.R. § 1007.55
in effectEffective: 2024-07-01The lender shall pay to HUD, at the time of issuance of the guarantee, a fee for the guarantee of loans under this part, in an amount equal to 1 percent of the principal obligation of the loan. This amount is payable by the borrower at closing.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-24.xmlFetched: 7/26/2026
