Notice of intent to prepare an EIS.
24 C.F.R. § 58.55
in effectEffective: 2024-07-01As soon as practicable after the responsible entity decides to prepare an EIS, it must publish a NOI/EIS, using the HUD recommended format and disseminate it in the same manner as required by 40 CFR parts 1500 through 1508.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-24.xmlFetched: 7/26/2026
