Removal of steel construction.
29 C.F.R. § 1926.858
in effectEffective: 2024-07-01(a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing.
(b) Cranes, derricks, and other hoisting equipment. Employers must meet the requirements specified in subparts N and CC of this part.
(c) Steel construction shall be dismantled column length by column length, and tier by tier (columns may be in two-story lengths).
(d) Any structural member being dismembered shall not be overstressed.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-29.xmlFetched: 7/26/2026
