Mandatory Reliability Standards.
18 C.F.R. § 40.2
in effectEffective: 2024-07-01(a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric Reliability Organization.
(b) A proposed modification to a Reliability Standard proposed to become effective pursuant to § 39.5 of this Chapter will not be effective until approved by the Commission.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-18.xmlFetched: 7/26/2026
